Silage Pits
Dairy Tech silage pits are designed to engineer specifications. The structure comprises three walls of pre-cast concrete and mesh, and a poured floor on Dairy Tech heavy-duty steel mesh.
General Construction Procedure:
Larger silage pits have the floor poured first with walls “stack poured” into boxing laid flat and built on site. A release agent is sprayed between each of the three wall layers. When set, is craned onto the floor.